• Kreu
  • Rreth Nesh
  • Sherbimet
  • Projekte
  • Kontakto
Shqip English
+355 67 670 0033
  [email protected]
Cemex Albania
  • Kreu
  • Rreth Nesh
  • Sherbimet
  • Projekte
  • Kontakto
Shqip English
1 2 3 4

Building 15A, “5 Maji”

Click here to show project info

Building 15A, “5 Maji”

Building 15A (section 1) in the development area “5 Maji”

Address:

  • St. "May 5"

Works performed:

  • Internal and external plastering, grouting, coating, internal and external painting, dry systems.